Monday, November 2, 2009

What To Wear With Black Mini Sequin Skirt

recovery of rainwater is a priority of the moment

At the last site meeting, the arcitecte Lepage Clement was concerned about the completion of the installation of gutters and roofs of their connection with the two reservoirs 180 m3 each.
From left to right: Clement LEPAGE (architect),
Nicolas Farget (EDF Energies Nouvelles)
and Lawrence BRUNO (SMAC)

Installing gutters

(Pictures are not copyright-free. Reproduction prohibited)

0 comments:

Post a Comment